PowerLab for tiny home

Tiny-home electrical that passes inspection the first time

Residential-grade appliances in a 200 sqft footprint is a genuinely hard electrical problem. PowerLab handles it — and gives you the permit-ready PDF the AHJ actually wants to see.

Referenced standards: NEC Article 550 / 551 · CEC Section 70 · ANSI/RVIA tiny-home standard

Real residential appliances

Mini-split heat pump, heat-pump water heater, induction cooktop, dishwasher — all modeled honestly, not approximated.

Hybrid grid + solar + battery

PowerLab models all three charging sources at once so you know when the grid’s actually off-loading your panels.

Permit-ready PDF

One-line diagram, OCPD + conductor schedule, explicit NEC/CEC citations. What your AHJ wants, in one doc.

Works on foundation too

DC or AC-coupled, on-wheels or on foundation — the math’s the same. Hybrid systems fully supported.

Typical loads we already model

These are realistic watt draws and duty cycles pulled from the PowerLab appliance catalog. When you start a design, you pick from this catalog and customize \u2014 nothing to re-type.

LoadWattsHrs/dayWh/day
Mini-split heat pump (12k BTU)90087,200
Heat-pump water heater55031,650
Induction cooktop (2-burner)3,6000.51,800
Refrigerator (Energy-Star)15081,200
Dishwasher1,40011,400
LED lighting + ceiling fan806480
Laptop + router + starlink100101,000
Sample total14,730 Wh/day

Typical real-world band for this niche: 4,000\u201312,000 Wh/day (midpoint 8,000). Your actual number depends on your gear and how you use it; PowerLab calculates it exactly.

Pro Plus: Co-Pilot AI

Ask these once your design is loaded

PowerLab Co-Pilot sees your exact design and can answer questions in plain English. Starter prompts for this niche:

  • \u203aCan my system cover 3 days of winter autonomy at 55°N?
  • \u203aIs a heat-pump water heater or a tankless better for my load profile?
  • \u203aWhat’s my peak simultaneous draw if everything cycles on at once?
See Pro Plus — $39/mo

Frequently asked

Can I really go fully off-grid in a tiny home?

Yes, but you’ll want LiFePO4, 1500–3000W of solar, and realistic expectations about winter. PowerLab models peak-sun-hours by region so you see the truth, not the brochure.

What about the permit inspection?

Our permit-ready PDF (Pro+ one-off) covers the load schedule, OCPD schedule, conductor schedule, and code references the AHJ expects. A licensed electrician still has to stamp it — we just do the math they’d bill for.

Does PowerLab handle 120/240V split-phase?

The calculation engine is currently DC-first with a single-phase AC inverter model. Full 240V split-phase (with a hybrid inverter like a Sol-Ark) is on the roadmap. Today, model each 240V load as a single 120V load at equivalent watts and it’s close enough for sizing.

Design yours in the next 10 minutes

Free tier gets you load + battery + solar sizing for up to 3 designs. No credit card required. Upgrade when you need the Co-Pilot, live BMS monitoring (Victron live today), or permit-ready PDFs.

Start designing free

PowerLab also designs power for: